How long it takes to make and fit gates

Standard side gates are usually fitted within 1 to 2 weeks. Made-to-measure driveway gates typically take 3 to 6 weeks to fabricate and galvanise, and turnkey automated jobs take 4 to 8 weeks.

Realistic Irish timelines from the first site measurement through fabrication, galvanising and hanging day.

Free, no obligation. One local fitter prices it, not five.

  • 1–2 wksstandard side gate lead time
  • 3–6 wksmade-to-measure fabrication
  • 4–8 wksautomated turnkey turnaround
  • 1 to 2 dayson-site fitting for driveways
A concrete footing being poured around steel reinforcement for a gate post or pier

Step-by-step timeline from survey to handover

  1. Week 1: Site visit and written quote. The fitter checks opening widths, pier strength, ground slope and cable routes, then sends a fixed written specification.
  2. Weeks 2 to 4: Fabrication and finishing. Gates are cut, welded or joined, sent out for hot-dip galvanising and powder coated to your chosen RAL colour. Galvanising queues add 5 to 10 working days in busy spring months.
  3. Civils ahead of hanging day. If new piers, concrete posts or underground motor boxes are needed, they are poured and cured for at least 5 to 7 days before heavy leaves are hung.
  4. Fitting day (half day to 2 days). Side gates hang in half a day. Manual driveway pairs usually finish in 1 day; automated gates with intercom commissioning take 1 to 2 days.

Price my gate

Four quick taps and our price shows before we ask for a phone number. One local gate fitter rings you, not five.

Steel driveway gates, about 3 m wide, manual: €1,800 to €3,200, supplied and fitted.

Step 1 of 5

What kind of gate?

Pick the closest. The fitter checks the rest on site.

How the price is worked out

The range reflects typical supply-and-fit gate prices in Ireland for that material, opening width and operation. Manual driveway figures cover gates, posts or hanging ironwork and fitting into a ready opening. Electric options add motors, safety photocells and handsets. New masonry piers, heavy groundworks and armoured cable trenching from the house depend on your site and are priced after a look. Ask whether VAT is quoted at 13.5% or 23%. Use this figure to plan: only a fitter who measures the opening gives a firm quote.

Why spring and early summer take longer

Irish gate fabricators, galvanising plants and blocklayers hit peak demand from March to July. If you want new driveway gates fitted before summer or ahead of a driveway resurfacing job, book the initial site measurement six to eight weeks ahead and have ducting laid before the tarmac crew arrives.

Common questions before you buy

How long does it take to fit a side gate?

Standard timber or metal side gates are usually fitted within 1 to 2 weeks and take half a day on site.

Should gates or tarmac go in first?

Install piers, concrete footings, sliding gate foundation beams and underground cable ducts BEFORE tarmac or cobble paving, then hang the finished gate leaves once the final surface height is set.

How long does concrete need to cure before hanging heavy gates?

Allow at least 5 to 7 days for concrete post footings or underground motor boxes to gain strength before hanging heavy leaves.

All gate pages and guides

Automated hardwood double entrance gates between red brick piers with an intercom post and gravel drive